Your Stair Modernization Project

Everything discussed, pictured, priced and approved is kept here.

Project statusDesign options in review

Scope is being prepared from the selected materials and finish choices.

Current invoice$356.95

Completed landscaping work. Payment due upon completion of service.

Next decisionSelect stair finish

Confirm tread color, riser color and side trim treatment.

Last updateJuly 22, 2026

Client portal created and invoice details added.

Project at a glance

Initial request

Evaluate painting the existing exterior stairs.

Condition review

Replacement treads and risers considered as a longer-lasting option.

Visual design

Material and color combinations reviewed from multiple angles.

Final scope and price

Prepared after design selections are confirmed.

Installation

Scheduled after approval and material availability.

Visual decision center

See it before we build it.

Compare the concepts created for your actual stairs.

SELECTED DIRECTIONClam Shell TreadsWhite risers and finished side trim

Option A

Warm gray composite tread with crisp white risers.

ALTERNATEDarker TreadsWhite risers and matching fascia

Option B

Higher contrast and a more contemporary appearance.

ALTERNATECoordinated GrayGray tread and riser treatment

Option C

A quieter, more uniform exterior finish.

Photo library ready.

The actual stair mockups can be dropped into this section as image files. The portal structure is already prepared for them.

Draft for review

Scope of Work

This becomes the approved project plan and later supports the final invoice.

DRAFT

Exterior Stair Modernization

  1. Protect and prepare the work area.Confirm dimensions, material quantities and safe access before removal begins.
  2. Remove existing tread and riser components as required.Dispose of removed project debris unless otherwise agreed.
  3. Inspect existing stair framing and stringers.Identify visible deterioration or conditions requiring a written change order.
  4. Install new composite stair treads.Use approved color and layout, including finished side-edge treatment to conceal grooved board ends.
  5. Install new risers and side trim.Use the approved white or coordinated finish selected by the customer.
  6. Prepare and coat retained wood components.Sand sound existing surfaces, prime appropriately and apply exterior-grade finish coating.
  7. Final cleanup and customer walkthrough.Review completed work, care guidance and any remaining punch-list items.

Not included unless added in writing

Structural reconstruction, hidden rot repair, code-required railing changes, permits, electrical work, masonry repair or unrelated deck repairs.

Transparent project record

Costs & Receipts

Your completed landscaping invoice is shown below. The stair project will receive its own estimate and cost log.

Open Invoice Sheet
DARLING PROJECTS1075 Creek Field Drive · Webster, NY 14580(585) 330-4480
INVOICE#2026-030July 22, 2026
CUSTOMERDonna and Bob991 Pathway Lane, Webster, NY 14580
DescriptionRateQty/HrsAmount
Labor, including material pickup and delivery$30.007$210.00
Black plastic landscape edging — ½ roll$30.000.5$15.00
Premium weed barrier fabric — ½ roll$17.980.5$8.99
25-pack metal landscape fabric pins$6.981$6.98
White marble chips — 15 bags$7.2815$109.20
Pond stone — 1 bag$6.781$6.78
TOTAL$356.95

Terms: Payment due upon completion of service.

Receipt & Cost Log

This prototype stores added notes on this device. A production version would securely upload files and sync them to the customer record.

Project planning

Schedule

Dates become firm after final scope approval and material confirmation.

Initial consultation and condition reviewCustomer’s original paint request expanded to include tread replacement options.
Visual concept developmentMultiple material, tread, riser and side-finish directions prepared.
Customer design selectionConfirm final combination and any railing decision.
Site measurements and final estimateVerify quantities, labor, conditions and availability.
Material procurement and installationDates assigned after approval and deposit/payment terms.
Project communication

Messages

Keep project decisions separate from ordinary text-message clutter.

Darling Projects · July 22

Welcome to your project page. Your design options, scope, invoice and decisions are now organized here.

Clear decisions

Decisions & Approvals

A running record of what has been selected, approved or remains open.

Selected
Option A — Clam Shell treads with white risers

Visual direction selected in the portal.

Pending
Final material and fastening specifications

Confirmed after site measurement and supplier availability check.

Pending
Final scope and project price

Customer approval required before purchasing and scheduling.

Approval record